10
ENGLISH
The data and information shown in this manual may be changed by CAME cancelli automatici s.p.a. at any time without prior warning.
8 Maintenance
8.3 Extra-ordinary maintenance
Installer’s stamp Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed________________________________________________________________________________________
__________________________________________________________________________________________________
The following table serves to note down any extraordinary maintenance, repairs or improvements performed by specia-
lised firms.
N.B.: Any extraordinary maintenance must be performed by specialised technicians.
Installer’s stamp Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed________________________________________________________________________________________
__________________________________________________________________________________________________
Installer’s stamp Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed________________________________________________________________________________________
__________________________________________________________________________________________________
Extra-ordinary maintenance log
Date
Notes
Signature
Periodic maintenance log for end-user (every 6 moths)