UNCRATING
PREDELIVERY KI
T
DESCRIPTION W HERE USED QTY
M6 x 20 hexagonal flange
screw
Rear
suspension
1
Black M 6 x 20 hexagonal
flanged forming screw
Front cargo
module
4
Gold M6 x 20 hexagonal
flange screw
Front cargo
module
2
Plastic rivet
Service cover
2
Battery installation kit (2
bolts a nd 2 nuts)
Battery
terminals
1
M6 x 20 Torx screw Front panels 2
Plastic washer Front panels 2
M14 jam nut Headlights 2
M8 x 20 hexagonal flange
screw
Front fenders 8
M6 x 20 Torx screw Windshield
4
M5 x 25 countersunk
Torx scre w
Windshield 2
M5 retaining nut Windshield 2
Windshield spacer Windshield 2
Hose clamp Air inlet duct
1
Lifting the Front of Vehicle
WARNING
No one should be standing in front or at the
back of the vehicle while straps are being cut.
1. Remove metal plate retaining front of vehicle to
crate base.
NOTE:
If you are planning to use a hoist to lift ve-
hicl
e from crate base for tire i nstallation, only the
wood
screws need to be removed at this time.
rbl2014-004-005_a
TYPICAL
1. Plate
2. Screws
3. Screws and nuts
2. Remove straps retaining side and front of vehi-
cle to c rate base.
rbl2010
-002-011_a
TYPICAL, LH SIDE
1. Side strap
rbl2
014-004-032a
LH FRON T ILLUSTRATED
1. Front strap, each side
8 / 52 2014-1 PREDELIVERY