EasyManua.ls Logo

Carrier KSACN0501AAA - Preparatory Operation; Setting Current Day and Time

Carrier KSACN0501AAA
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
INSTALLATION
KSACN0401AAA
Adapter board
Display board
4-core shielding wire
The connection
cable
CN101
Fig. 3 - Installation of KSACN0401AAA for High Wall Indoor Models
1. Install the Adapter Board and the Display Board on the High Wall (See the Appendix for
instructions).
2. Connect the female joint of the wires group from the adapter board with the male joint of the
connective wires group. Next, connect the other side of the adapter board with the display
board (see Fig. 3).
3. Connect the other side of the connective wires group with the male joint of the wires group
leads from the wire controller (see Fig. 3).
Mainboard
4-core shielding wire
KSACN0501AAA
The connection cable
CN40
Fig. 4 - Installation of KSACN0501AAA for Cassette, Ducted Indoor Models
1. Connect the female joint of the wires group from the mainboard with the male joint of the
connective wires group (see Fig. 4).
2. Connect the other side of the connective wires group with the male joint of the wires group
leads from the wire controller (see Fig. 4).

Other manuals for Carrier KSACN0501AAA

Related product manuals