EasyManua.ls Logo

Carrier PG96MSA - Page 53

Carrier PG96MSA
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PG96MSA: Installation, Start-up, Operating and Service and Maintenance Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
53
Control Board Replacement
If the control board must be replaced, the new board must be
programmed with the correct Model Program Number before the furnace
will operate. Do NOT program the control board with a Model Program
Number different than what is specified on the rating plate. The control
may be programmed by either of these approved methods:
1. Use the supported mobile app to flash the model program onto the
board using Near Field Communication (NFC). Scan the QR code
on page 1 of this manual for more information and a link to
download the mobile app.
2. Use the correct Super Plug (available from distributor / replacement
component) for the control board to copy the correct model
program onto the new board.
Further details and instructions for these programming methods are
provided with the replacement control board.
A220518
Fig. 58 – 3 Digit Display Flow Chart
CAUTION
!
FURNACE OVERHEATING HAZARD
Failure to follow this caution could result in reduced furnace life.
Do NOT program the control board with a Model Program Number
different than what is specified on the rating plate. Parameter options
will not match design values.

Related product manuals