Carrier service manual R410a DC Inverter 60Hz
Installation
2.2.5 Installation highlights for outdoor unit
1. Install vibration isolator or isolating pad between the set and the base by the design specification.
2. Ensure close between the outdoor unit and the base, or significant vibration and noise may occur.
3. Ensure that outdoor unit is well grounded.
4. Before commissioning, do not turn on the valves of the gas pipe and liquid pipe of the outdoor unit.
5. Ensure sufficient maintenance space is available at the installation site.
2.2.6 Installation space for outdoor unit.
1) One row
Note: 1m=3.28ft, 100mm=3-15/16in., 500mm=19-11/16in., 800=31-1/2in.
2) Two rows
3) More than two rows
4) When the outdoor unit is lower than the surrounding obstacle,
Refer to the layout used when the outdoor unit is higher than the surrounding obstacle. However, to
avoid cross connection of the outdoor hot air from affecting the heat exchange effect, please add an air
>1m
>1m
>1m
100-500mm
Front Front
>800mm
>1m
>1m>1m
>1m
100-500mm
Front Front
Front Front
>800mm
>1m>1m
>1m
>1m
>1m
100-500mm
Front Front
Front Front
Front Front
>800mm