EasyManua.ls Logo

Cascade TEK TVO-2 - Installation; Installation Procedure Checklist

Cascade TEK TVO-2
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17 | Page
INSTALLATION
INSTALLATION PROCEDURE CHECKLIST
For installing the oven in a new workspace location.
Pre-Installation
Verify that a vacuum supply source suitable for your application is available
and can be connected to the oven, page
9.
See page 23 for the oven gas and vacuum port locations.
Check that the required ambient conditions for the unit are met, page 18.
Check that the spacing clearance requirements are met, page 18.
Unit dimensions may be found on page 57.
Check that a suitable electrical outlet and power supply is present, page 19.
Install the oven in a suitable workspace location
Review the lifting and handling instructions, page 19.
Install the unit leveling feet, page 20.
Install the oven in its workspace location, page 20.
Set up the oven for use
Clean the oven shelving. Clean the chamber if needed, page 20.
Install the shelving in the oven chamber, page 21.
Connect the oven to its vacuum supply source along with any optional backfill gas
supply, page
23.