EasyManua.ls Logo

Cast Tec Integra - User Manual

Cast Tec Integra
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Integra High Output Remote Control
Inset Live Fuel Effect Gas Fire
Installation and
Users Instructions
These instructions should be read by the
installer before installation and then should be
handed to the end user when the installation
is complete.
This is an official requirement and is the
responsibility of the fitter of this
appliance.
Having installed the appliance, the installer
should take the necessary steps to ensure
that the user fully understands how to operate
the appliance and is also made aware of the
fire’s basic cleaning and maintenance
requirements.
Question and Answer IconNeed help?

Do you have a question about the Cast Tec Integra and is the answer not in the manual?

Summary

Notes for the Installer and End User

Installation Requirements

Flue Flow Test

Procedure to check flue effectiveness and ensure no leakage into premises.

Spillage Test

Test to check clearance of combustion products into the flue.

Installation Procedure for Standard 22 x 16 Opening

Installation Procedure for Decorative Cast Surround

Commissioning

Procedure for checking pressure and fitting ceramic components.

Trouble Shooting (Gas Safe Engineer Only)

Remote Control Component Layout

Test Sequence

Fault Finding Table

User Instructions

Lighting Procedure

Step-by-step guide on how to light the fire using the remote handset.

Cleaning and Maintenance

Coal Layout Instructions - Natural Gas & LPG

Cast Tec Integra Specifications

General IconGeneral
CategoryIndoor Fireplace
StyleTraditional
MaterialCast Iron
Fuel TypeWood
Heat Output (kW)5kW