QUICK REFERENCE INSTALLATION INFORMATION
1. Pneumatic Requirements: (One Hookup) Run 1/2" line to main Filter / Regulator with an output of 4
CFM operating at 80 PSI.
2. Electrical Requirements: (One Hookup) A 25 amp dedicated circuit should be supplied to the main
control panel.
3. Installing Slide gate: Install the slide to supply bin. There should be wires that are labeled from the
slide gate that need to be connected into Junction box (1) located on the filler.. The wires need be
terminated in the J-Box for the Slide gate solenoids and the reed magnet, (used for setting up the
dribble position on the slide gate).
4. See attached layout drawing for reference information.
For Technical Assistance call main: 512-352-3694
For Parts or Service needs call main number or email: Parts-Service@choicebagging.com
For New Equipment call main number or email: INFO@choicebagging.com
For Used Equipment call main number or email: Parts-Service@choicebagging.com