EasyManua.ls Logo

CDI CD42-T1A - CD42-T2 Battery Installation

Default Icon
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22 Hz ELECTROMAGNETIC TRANSMITTER USER GUIDE
Page 20 of 52
GETTING STARTED ͳ CD42ͳT2
Installing BaƩ eries
Load T2 Ba ery Carousel with
six (6) C-Cell alkaline ba eries.
Posi ve terminal (+) is always
opposite tension spring.
Replace carousel as shown.
Inspect cap and O-ring before
replacing.
Ensure O-ring is serviceable. A
bri le and/or deformed O-ring
may not properly seal. Lubricate
O-ring with a light coa ng of
petroleum jelly if dry.
Ensure O-ring groove and screws are clean and free of ruptures, dents,
or other damage.
NOTE: it is good prac ce to
always install new ba eries
prior to deployment.