CEBORA S.p.A. 7
3 - MAINTENANCE.
WARNINGS
ANY INTERNAL INSPECTIONS OR REPAIRS MUST BE CARRIED OUT BY QUALIFIED
PERSONNEL.
BEFORE BEGINNING MAINTENANCE OPERATIONS, UNPLUG THE MACHINE FROM
THE MAINS AND WAIT FOR THE INTERNAL CAPACITORS TO DISCHARGE
(1 MINUTE).
3.1 - Periodic inspection, cleaning.
Periodically remove dirt or dust from the internal parts of the Power Source, using a jet of
low-pressure dry compressed air or a brush.
Check the condition of the output terminals and power supply cables of the Power Source;
replace if damaged.
Check the condition of the internal power connections and connectors on the electronic
boards; if you find “loose” connections, tighten or replace the connectors.
3.2 - Operative sequence.
The following sequence reflects correct equipment operation. It may be used as a guiding
procedure for troubleshooting.
It must be carried out after each repair without any errors.
3.2.1 - Power Source controls and signals.
3.302.269 12/04/2012