Point Operation
[Point 1]
Disassembly:
Fully lower the mast;
Connect the chain on the points shown before removing
the mast
[Point 2]
Disassembly:
Remove the 4 bolts that fix the mast to the frame from
the bottom
Installation:
After installation, tightening torque of the 4 screw of the
mast = 83 Nm
[Point 3]
Disassembly:
Remove the 2 screws of the safety plates and then the 2
pins of the tilting cylinders.
Installation:
After installation, tightening torque of the 2 screws of the
safety plates for the pins of tilting cylinders = 24 Nm