11-24
THIRD WAY SYSTEM (SUPPLY PIPES) - MAST 2M FFL
REMOVAL • INSTALLATION
Removal procedure
1. Tilt the mast forwards and lock the mobile mast and carriage using appropriately sized and protected
eye bolts and belts
2. Lower the mast to prevent the supply pipes from remaining in tension
3. Loosen the pulley fixing screws
4. Remove the support
5. Remove the terminals [Point 1]
6. Position a container to collect the oil
7. Remove the pipes [Point 2]
Installation procedure
The reassembly procedure is the reverse of the disassembly procedure.