EasyManua.ls Logo

Cessna T188C - Blowing out Lines; Pitot System Inspection and Leakage Test; Removal and Installation; Trouble Shooting Pitot Static System

Cessna T188C
624 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MODEL
188-&
T188
SERIES
SERVICE
MANUAL
15-12.
PITOT
SYSTEM
INSPECTION
AND
LEAKAGE
Like
the
pitot
lines,
static
pressure
lines
must
be
TEST.
To check
pitot
system for
leaks,
place
a
piece
kept
clear
and
connections
tight. Static
source
sumps
of
tape
over
small
hole
in
lower
aft
end
of
pitot
tube,
collect
moisture
and
keeps
system
clear.
However,
fasten
a
piece
of
rubber
or
plastic
tubing
over
pitot
when
necessary,
disconnect
static
line
at
first
instru-
tube,
close
opposite
end
of
tubing
and
slowly
roll
up
ment
to
which
it is
connected,
then
blow
line
to
clear
tube
until
airspeed
indicator
registers
in
cruise
range.
with
low
pressure
air.
Check
all
static
pressure
line
Secure
tube
and
after
a
few
minutes recheck
airspeed
connections
for
tightness.
If
hose
or
hose
connec-
indicator.
Any
leakage
will
have
reduced
the
pres-
tions
are
used,
check
for
general
condition
and
clamps
sure
in
system,
resulting
in
a
lower
airspeed
indica-
for
security.
Replace
hose
which
have
cracked,
tion.
Slowly
unroll
tubing
before removing
it,
so
hardened
or
show
other
signs
of
deterioration.
pressure
is
reduced
gradually.
Otherwise
instru-
ment
may
be
damaged.
If
test reveals
a
leak
in
sys-
15-14.
REMOVAL
AND
INSTALLATION
OF
COM-
tem,
check
all
connections
for
tightness.
PONENTS.
(Refer
to
figure
15-2).
To
remove
the
pitot
mast,
lower
the
access
cover,
then
disconnect
15-13.
BLOWING
OUT
LINES.
Although
the
pitot
line
and
heater
wires
(if
installed).
Pitot
and
static
system
is
designed
to
drain
down
to
pitot
tube open-
lines
are
removed
in
the
usual
manner,
after
remov-
ing,
condensation
may
collect
at
other
points
in
sys-
ing
access
plates.
Installation
of
the
tubing
will
be
tern
and
produce
a
partial
obstruction.
To
clear
the
simpler
if
a
guide
wire
is
drawn
in
as
tubing
is
being
line,
disconnect
it
at
airspeed
indicator.
Using
low
removed.
When
replacing
components
of
the
pitot
pressure
air,
blow
from
indicator
end
of
line
toward
and
static
pressure
systems,
use anti
seize
compound
the
pitot
tube.
sparingly
on
male
threads,
avoid
excess
compound
which
might
enter
lines.
Tighten
connections
firmly,
CAUTION
but
avoid
overtightening
and
distorting
the
fittings.
If
twisting
of
plastic
tubing
is
encountered
when
tight-
Never
blow
through
pitot
or
static
lines
ening
fittings,
VV-P-236
(USP
Petrolatum),
may
be
toward
the
instruments,
applied
sparingly
between
tubing
and
fittings.
15-15.
TROUBLE
SHOOTING
--
PITOT-STATIC
SYSTEM.
TROUBLE
PROBABLE
CAUSE
REMEDY
LOW
OR
SLUGGISH
AIRSPEED
Normal
altimeter
and
vertical
Repair
or
replace
damaged
INDICATION.
speed
-
leak
or
obstruction
in
Line.
pitot
line.
INCORRECT
OR
SLUGGISH
Both
instruments
-
leaks
or
Repair
or
replace
line.
RESPONSE.
obstruction
in
static
line.
15-16.
TROUBLE
SHOOTING-- PITOT
TUBE
HEATER.
TROUBLE PROBABLE
CAUSE
REMEDY
TUBE
DOES
NOT
HEAT
OR
Switch
turned
"OFF."
Turn
switch
"ON."
CLEAR
ICE.
Circuit
breaker
"Open".
Reset
breaker.
Break
in
wiring.
Repair
wiring.
Heating
element
burned
out.
Replace
element.
15-5

Table of Contents

Related product manuals