MODEL
188
&
T188
SERIES
SERVICE
MANUAL
NOTE
CAUTION
Insure
that
hopper
is
clean
and
drained
prior
Exercise
caution,
as
mount
latches
are
to
working
under
aircraft
on
the
dispersal
open,
because
spreader
will
drop
down
system.
Even
small
amounts
of
agricultural
and
possibly forward,
if
not
supported.
chemicals
can
be
dangerous.
b.
Referring
to
figure
19-14,
set
up
2-inch dimen-
a.
In
cockpit
place
gatebox
door
control
in
FULL
sion at
gate
hinge
forks
(6)
and
the
11.
6-inch
dimen-
FORWARD
position.
Micrometer
screw
stop
must
sion
on
gate
box
assemblies
(4).
be
lifted
to
allow
control
to
move
to
the
dump
c.
In
cockpit,
move
gate
box
control
handle
(item
position.
9,
figure
19-15)
to
the
FULL
AFT
position
b.
Disconnect
two
gate
box
rod
assemblies
(4)
from
gate
assembly
(5),
allowing
door
(9)
to
NOTE
swing
free.
(See
figure
19-15.)
c.
Remove
four
door
mount
bolts
(8)
allowing
Ensure
that
clearance
is
maintained
between
removal
of
door
(9)
from
gate
box,
exposing
control
arm
and
aircraft
belly
skin.
agitator.
d.
If
seal
is
to
be
replaced,
remove
nine
bolts
(10)
d.
Referring
to
figure
19-15,
align
control
rod
(3)
securing
seal
retainer
(11)
and
seal
(2)
to door
(9).
with
arm
on
bellcrank
assembly
(7).
e.
Install
hardware
in
removal
sequence,
ensuring
NOTE
that
sufficient
belly
clearance
is
maintained
and
that
bellcrank
is
locked
overcenter.
Seal
is
of
cast
urethane
compound
material,
f.
Referring
to
figure
19-14,
tighten
nine
gate
seal
and
is
sell
lubricating.
It
is
secured
by
the
mount
bolts
(10)
and
four door
mount
bolts.
(8).
retainer
only.
Bronze
bushings
on
agitator
g.
Operate
handle
in
cockpit
to
ensure
smooth
shaft
require
occasional
oiling,
operation
throughout
limits
of
movement
Overcen-
ter
should
be
felt
as
the
handle
reaches
FULL
AFT
e.
If
repair
or
removal
of
agitator
is
required,
traveL
proceed
to
step "h".
h.
Check
seating
of
gate
box
seal
by
pouring
water
f.
Place
door
in
opening
of
gate
box,
and
install
into
the
hopper
with
the
gate
closed.
There
should
four
mount
bolts
(8).
Loosen
two
gate
hinge
fork
be
no
seepage
around
seaL
nuts
(6)
as
new
seal
will
be
thicker
than
old
one.
If
reinstalling
same
seal,
above
step
may
be
NOTE
omitted.
g.
Connect
gate
box
rod
assemblies
(4)
to
door
If
leakage
is
evident,
adjust
hinge
fork
brackets
(5).
Since
rod
ends
are
not
normally
bolts
or
gate
box
rod
as
required
to
seal.
adjusted
from
the
11.6
inch
length,
re-adjustment
is
not
necessary,
however,
for
ease
of
operation
i.
Raise
front
of
spreader,
latch
two
front
mount
rods
may
be
lengthened,
when
dry
chemicals
are
latches,
and
install
eight
mount
screws.
Tighten
used.
two
rear
mount
bolts
(item
13,
figure
19-15)
at
rear
h.
Remove
four
speed
reducer
mount
bolts
on
of
spreader.
agitator
drive,
and
if
electrically
driven,
remove
applicable
wiring. Mark
wires
to
aid
installation.
Remove
speed
reducer,
separating
drive
coupling
19-32.
CLEANING
DISPERSAL
EQUIPMENT.
halves.
This
will
allow
agitator
removal
from
It is
important
that
dispersal
equipment
be
bearing
at
non-drive
end
of
gate
box.
To
reassemble
kept
clean.
Since
there
are
literally
thousands
of
reverse
above
steps.
Lube
agitator
bearing
surfaces
trade
formulations
for
chemicals
that
may
be
used
with
Electro
Molly,
No.
11.
in
aerial
application,
it is
impractical
to
list
clean-
ing
compounds
for
all
types.
Follow
manufacturer
19-31.
RIGGING.
instructions
when
given.
However,
a
solution
of
household
ammonia
and
water,
or
a
solution
of
NOTE
powdered,
activated
charcoal,
laundry
detergent,
and
water
will
generally
suffice.
Mix
the
ammonia
To
set
up
gatebox,
see
figure
19-14,
solution
in
a
ratio
of
one
quart
of
household
am-
and
loosen
nine
seal
mount
bolts
(10)
and
monia
to
one
gallon
of
water.
Prepare
about
five
four
door
mount
bolts
(8).
This
will
allow
gallons
and
pour
into
the
hopper,
agitate
vigorously
is
closed
With
spray nozzles
removed,
start
the
engine
and
operate
at
1500
rpm,
release
the
fan
brake
and
empty
the
hopper through
the
system.
This
will
a.
Gate
box
assembly
must
be
set
up
prior
to
rig-
empty
the
hopper through
the
system.
This
will
ging
the
controls.
To
accomplish
this,
drop
sprea-
water.
Mix
the
charcoal
solution
in
a
ratio
of
1/4
der
down
for
access.
See
figure
19-15,
remove
pound
of
activated
charcoal
and
1/8
to
1/4
pound
of
eight
screws
along
rear
edge
of
gate.
Loosen
two
laundry
detergent
to
10
gallons
of
water.
The
same
rear
spreader
mount
bolts
(13),
and
open
spreader
cleaning
and
flushing
procedure
may
be
used
with
latches
12).
this
solution.
When
operating
the
system,
be
sure
19-26

Table of Contents

Related product manuals