Cessna T188C - Boom Assemblies; Streamlined Boom Assemblies; Removal and Installation; Setting Boom Chord Angle of Incidence

Cessna T188C
624 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MODEL
188
&
T188
SERIES
SERVICE
MANUAL
check
hose
connections
for
tightness
and
deteriora-
19-19.
INSPECTION.
Inspect
hose
connections
for
tion.
See
figure
19-11
for
component
parts
of
the
tightness
and
deterioration.
Check
booms
for
cor-
Y-strainer
assembly.
rosion.
19-18.
BOOM
ASSEMBLIES
are
shown
in
figure
19-4,
19-20.
NOZZLES.
The
booms
are
equipped
with
which
may
be
used
as
a
guide
for
removal
and
re-
non-adjustable nozzles.
Fluid
pressure
moves
a
placement.
For
quick
removal
of
individual
booms:
spring-loaded
diaphragm
in
the
nozzle
to
allow
liquid
a.
Loosen
clamps
and
disconnect
hoses,
or
release
to
enter
the
core
of
the
nozzle,
where
it
is diffused
quick-disconnects
attaching
boom
assembly
to
Y-
and
emitted
as
spray.
Hold
nipple
and
turn
nozzle,
strainer
assembly.
using wrench
pad
on
nozzle
body,
to
remove.
b.
Remove bolt,
washer,
and
nut
from
clamp
halves,
then
pull
upper
and
lower
clamp
tabs
from
NOTE
slots
in
clamp
retainers,
and
pull
boom
aft.
Nozzle
direction
may
be
changed
by
rotating
19-18A.
STREAMLINED
BOOM
ASSEMBLIES
(BE-
the
booms
in
their
clamps.
GINNING
WITH
18803872.)
(See
figure
19-4.)
19-21.
DISASSEMBLY.
When
disassembling
a
19-18B.
REMOVAL
AND
INSTALLATION
-
STREAM
nozzle,
hold
nozzle
with
outlet
up
and
carefully
LINED
BOOM
ASSEMBLIES.
(See
figure
19-4,
sheet
disassemble,
noting
exact
relationship
of
parts
for
4
of
4).
reassembly.
For
quick
removal
of
Individual
booms:
a.
Disconnect
coupling
(16)
from
y-strainer
assem-
19-22.
ROTARY
ATOMIZER
OPTION.
Figure
bly
(18).
19-19
shows
the
rotary
atomizer
available
with
the
b.
Remove
nuts
(6)
and
bolts
(4)
then
remove
boom
1979
Model
Year
airplane.
The
atomizers
replace
(8).
nozzles
in
this
application.
Refer
to
Vendor
Publi-
c.
For
installation,
install
bolts
(4)
through
clevises
cations
for
complete
description,
operation,
and
(5)
and
boom
supports
(7),
and
install
nuts
(6).
maintenance.
Vendor
publications
are
available
d.
Index
booms
in
accordance
with
paragraph
19-18C.
thru
the
Cessna
Supply
Division.
19-18C.
SETTING
BOOM
CHORD
ANGLE
OF
INCI-
19-23.
PRESSURE
GAGE.
A
direct-reading
pres-
DENCE.
(See
figures
19-4,
sheet
4
of
4
and
19-4A.)
sure
gage
is
mounted
in
the
instrument
cluster
above
a. With
booms
installed,
loosen
nuts
(6)
and
bolts
the
panel
pad
in
the
cockpit.
The
gage
is
connected
(4)
on
one
boom
(8).
by
tubing
to
a
fitting
on
the
pump
discharge
tube,
b.
Loosen
clamps
(17).
left inboard
boom,
or
the
Y-strainer
assembly,
and
c.
Disconnect
coupling
(16).
indicates
boom
pressure.
To
remove
gage
from
d.
Insert
indexing
pin
(MS20392-1C33)
in
indexing
instrument
panel,
disconnect
tube
from
back
of
gage
hole
in
the
outboard
boom
support
(7)
and
rotate
and
unscrew
bezel
attaching
gage
to
panel.
boom
(8)
until
indexing
pin
is
contacted
by
clevis
(5).
e.
Tighten
nut
(6)
on
bolt
(4)
at
outboard
boom
sup-
19-24.
QUICK-LOADER
SYSTEMS.
Three
quick-
port.
loader
installations
are
available
as
optional
equip-
f.
Using
a
C-clamp,
secure
a
.
125
plate
outboard
ment.
The
left-hand,
right-hand,
and
dual
installa-
of
the
boom
support,
shown
in
figure
19-4A.
tions
are
shown
in
figure
19-16.
A
manually
oper-
g.
Attach
an
inclinometer
to
the
plate
as
shown
and
ated
valve
controls
flow
of
material
into
the
hopper.
set
to
00.
On
the
dual
installation,
be
sure
that
only
the valve
being
used
is
opened.
Removal
and
installation
of
NOTE
the
quick-loader
system
may
be
accomplished
while
using
the
illustration
as
a
guide.
Inspect
hose
con-
An
inclinometer
is
available
from
the
Cessna
nections
for
tightness
and
deterioration.
Check
the
Supply
Division,
See
figure
6-4.
valves
for
proper
operation.
Seal
all
inside
corners,
edges,
and
openings
in
and
around
boxes
(3)
with
h.
Being
careful
not
to
move the
dial
on
the
inclino-
General
Electric
RTV
102,
Dow
Corning
732
RTV,
meter,
remove
c-clamps,
plate,
and
inclinometer
or
equivalent
sealant.
from
outboard
location
and
move
to
next
inboard
boom
support.
i.
With
plate
and
inclinometer
installed,
read
the
CAUTION
degree
of
angle
and
make
necessary
adjustments
by
In
freezing
weather,
drain
the
hopper
and
rotating
boom
so
angle
of
incidence
reads
0.
quick-loader
valves.
Leave
valves
open
j.
Tighten
nut
(6)
and
bolt
(4)
at
this
location.
to
prevent
damage.
k.
Repeat
procedure
for
the
two
inboard
boom
sup-
ports.
1.
Tighten
hose
clamps
(17).
m.
Connect
coupling
(16).
n.
Remove
indexing
pin.
o.
Repeat
steps
a.
through
n.
for
opposite
boom.
Revision
1
19-21