EasyManua.ls Logo

Cessna T188C - Air Filler Valve; Electrically-Driven Agitator Installation; Description; Removal

Cessna T188C
624 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MODEL
188
&
T188
SERIES
SERVICE
MANUAL
the
clamp
on
reservoir
body
lug.
19-53.
REMOVAL
AND
INSTALLATION.
d.
Connect
all
lines
at
reservoir.
a-
Remove
clamp
and
hose.
e.
Fill
reservoir
to
FULL
mark
on
dipstick
with
b.
Unscrew
filter
assembly
from
coupler.
DEXRON-type
automatic
transmission
fluid,
and
c.
Reverse
preceding
steps
for installation.
pressurize
to
15
psi.
19-54.
ELECTRICALLY-OPERATED
SPRAY
VALVE
19-47.
RIGGING.
(See
figure
19-21,
sheet
9.)
SYSTEM.
(See
figure
19-24.)
a.
Remove
on-off
control
from
lever
at
reservoir
An
electrically-operated
spray
valve
is available
to
and
shut
valve
off.
replace
the
manual
valve
on
the
remote
pump
spray
b.
Push
bottom
of
on-off
control
in
cockpit
to
full-
system.
The
spray
handle
and
push-pull
control
of
forward
position.
the
manual
system
are
replaced
by
an
electrical
c.
Attach
control
to
valve
lever
at
reservoir.
switch
mounted
on
the
control
stick.
The
vernier
d.
Check
operation
of
control
for
freedom
of
move-
setting
of
the
valve
is
accomplished
by
a
stop
on
the
ment.
valve
actuated
from
the
cockpit
through
a
flexible
drive
shaft.
19-48.
AIR
FILLER
VALVE.
Due
to
the
deterior-
ating
effect
that
hydraulic
fluid
has
on
rubber,
the
19-55.
REMOVAL
AND
INSTALLATION.
Figure
air filler
valve
should
be
inspected
under
criteria
19-24
may
be
used
as
a
guide
for
removal
and
given
in
Section
2.
installation
of
system
components.
19-49.
REMOVAL.
(See
figure
19-23.)
19-56.
RIGGING.
(See
figure
19-24.)
a.
Depressurize
reservoir
by
depressing
air
filler
a.
Disconnect
flexible
control
(4)
at
aft
end
of
valve
core
(52),
and
remove
core
after
pressure
is
valve
(13).
released.
b.
Rotate
stop
(18)
to
full
FORWARD
position.
b.
Remove
reservoir
filler
cap
(41)
and
screen
(42).
c.
Turn
on
master
switch.
Thread
a
piece
of
safety
wire
through
air
filler
valve
d.
Using
switch
(9)
on
control
stock,
actuate
arm
stem,
reservoir,
and
oil
filler
port.
on
valve
(13)
to
full
FORWARD
position
(FULL-
c.
Cut
air
filler
valve
stem
(52),
and
remove
in-
OPEN),
then
turn
master
switch
off.
ternal
portion
with
safety
wire.
e.
Rotate
nut
on
forward
end of
shaft
(16)
until
stop
(18)
rests
against
valve
arm.
19-50.
INSTALLATION.
f.
In
cockpit,
turn
knurled
knob
on
shaft
to
move
a.
Wet
new
air
filler
valve
stem
around
groove
with
stop
(5)
to
full
AFT
position
to
line
up
with
'20"
on
clean
hydraulic
fluid
(DEXRON
Automatic
Transmis-
placard
(FULLY-OPEN)
mounted
adjacent
to
control.
sion
Fluid),
and
wrap
safety
wire
around
threaded
end.
g.
Connect
flexible
control
at
aft
end
of
valve
(13).
b.
Insert
safety
wire
wrapped
valve
stem
through
filler
port,
and
align
with
air
valve
mount
port.
Pull
19-57.
ELECTRICALLY-DRIVEN
AGITATOR
IN-
valve
stem
through
port
with
long
nosed
pliers
or
with
STALLATION.
(See
figure
19-25.)
tire
valve
installing
tool.
Beginning
with
serial
18800833,
an
electric-driven
agitator
is
available.
The
previous
optional
agitators
NOTE
for
the
gate
box,
which
are
still
available, were
air-
driven
fans
causing
some
drag loss
and
operational
Use
care
when
installing
air
valve
stem.
Re-
vibration.
The
electric-driven
agitator
is
a
part
of
move
safety
wire
while
holding
stem,
and
pull
the
gate
box
assembly
and
is
available
in
12
or
24
stem
through
orifice
carefully,
because
metal
volts.
Activation
of
the
agitator
motor
is
controlled
edge
of
reservoir
top
may
cut
through
valve
by
a
microswitch
attached
to
the
metering
gate
con-
stem
creating
a
hazard
condition.
trol.
When
the
hopper
is
opened
for dry
dispersal,
the
agitator
automatically
functions.
e.
Reinstall
filler
screen
(42)
and
cap
(41),
pres-
surize
reservoir
to
approximately
15
psi
with
clean
19-58.
RIGGING.
(See
figure
19-25.)
air
source,
and
install
air
valve
cap.
a.
Move
gate
box
control
handle
to
full
aft
position
(gate
box
closed).
19-51.
SPRAY
PUMP
STRAINER.
(See
figure
b.
Adjust
switch
roller
to
contact bellcrank
as
19-22.)
lever
is
moved
forward
to
open
gate
box.
c.
Electric
motor
should
start
as
gate
box
opens.
19-52.
DESCRIPTION.
A
strainer
may
be
mounted
between
the
gate
box
outlet
and the
spray
pump
of
liquid
dispersal
systems
to
strain
out
undissolved
liquid
dispersal
materials
and
to
catch
foreign
ob-
jects
before
they
reach
the
spray
pump.
Removal
of
the
strainer
screen
for
cleaning
or
daily
inspec-
tion
is
accomplished
by
cutting
the
safety
wire
and
turning
the
handle
at
the
bottom
of
the
strainer
in
a
counterclockwise
direction.
If
necessary,
a
screw-
driver
or
suitable
tool
positioned
through
the
handle
will
give
added
leverage
for
loosening
the
strainer
cap
and
screen.
19-52

Table of Contents

Related product manuals