EasyManuals Logo

Chigo CCB-18HR1 User Manual

Chigo CCB-18HR1
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #156 background imageLoading...
Page #156 background image
R410A50Hz Universal Outdoor Series Technical Manual Installation
153
GD Chigo Heating & Ventilation Equipment Co., Ltd.
For construction convenience, before laying pipes, use insulation material to insulate the pipes to
be deal with, at the same time, at two ends of the pipe, remain some length not to be insulated, in
order to be welded and check the leakage after laying the pipes.
5.2.3. Insulate for the jointing area, expanding area and the flange area
Insulate for the jointing area, expanding area and the flange area should be done after
checking leakage of the pipes
Make sure there’s no clearance in the joining part of the accessorial insulation material and
local preparative insulation material.
5.3 Drainage pipe insulation
The connection part should be insulated, or else water will be condensing at the non-insulation
part.
5.4 Note
5.4.1 The jointing area, expanding area and the flange area should be heat insulated after passing
the pressure test
5.4.2 The gas and liquid pipe should be heat insulated individually, the connecting part should be
heat insulated individually.
5.4.3 Use the attached heat-insulation material to insulate the pipe connections (pipes’
tie-in ,expand nut ) of the indoor unit
.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Chigo CCB-18HR1 and is the answer not in the manual?

Chigo CCB-18HR1 Specifications

General IconGeneral
BrandChigo
ModelCCB-18HR1
CategoryAir Conditioner
LanguageEnglish

Related product manuals