Pag. 27 a 47 28/02/2023 Nome file: DOC0103 A00
1.2 EQUIPMENT REQUIRED
To properly install and maintain the Dryer you will need this equipment in advance:
- cordless screwdriver/drill
- Phillips bit PH1
- Phillips bit PH2
- flat-blade screwdrivers width 3-5-8 mm
- Phillips screwdrivers n ° 1-2
- adjustable spanner wrench
- fork spanner set 7-8-10-13-17-19-24-30
- tube spanner set 7-8-10
- Allen key set up to 10
- universal pliers
- clamp for tube housings up to 25mmq
- cutter
- spirit level
- AC/DC multimeter
- current clamp
- thermometer with wired probe