EasyManua.ls Logo

CIMLINE MATRIX 1500 - Material Loading Procedure; Loading Empty Tank; Sealing Procedure; Sealing Process Steps

Default Icon
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 12 -
Sealing Procedure
1
2
3
1) Turn flow control valve (A) counter clockwise until valve bottoms out.
2) With wand in access port (B) and the trigger pinned, open loading (C) door and
increase flow valve (A) until the desired flow has been achieved.
3) Close loading door (C) and unpin wand trigger.
4) Pull wand from access port and proceed to joint or crack to be filled.
5) Place the sealing tip into the joint, press trigger and begin sealing by dragging tip
through the joint.
6) If the flow rate is incorrect, repeat steps 1 through 5.
7) As you approach the end of the joint, depress the trigger to avoid access spillage.
Loading Empty Tank
1) All material must be clean. Keep all
foreign matter out of melting tank.
2) Open the material door (1) and place
slab or biscuit (2) on the open door
against the holder (3).
3) Push door to the closed position. DO NOT DROP MATERIAL INTO THE MELTER
WITH DOOR OPEN.
A
B
C
8) To avoid material
freezing in the
hose, always return
the wand to the
access port and pin
the trigger to allow
material to circulate
through the hose.
Material Loading Procedure

Related product manuals