- 8 -
Operating Sequence
NOTE: This step by step procedure is only an outline. Refer to the page(s) indi-
cated for complete instructions.
PROCEDURE: PAGE
1) Place wand in return port . 6
2) Switch pump and agitator toggle switch to the forward position.
10
3) Start engine per engine operating instructions. 9
4) Add material, typically 2-3 biscuits if tank is empty. 12
5) Adjust flow to sealing wand.
12
6) Remove Wand and start sealing. 12
Once the oil temperature reaches 325deg F, the agitator will start rotating.
Once the Material temperature reaches 350 Deg F, the material pump will start.
At the end of the Day
1) Return Wand to Access Port and pin trigger 6
2) Switch the material toggle switch to the reverse operation and allow to run 2 min. 12
3) Turn engine off and remove key. 12
4) Lock hose boom in tow position.
5) Always secure sealing wand, sealing hose and hose boom
before towing the Melter.
NOTE: When leaving reheatable material in tank, allow the agitator to run until the
oil and material temperatures are the same.