1-53
Cisco CRS-1 Carrier Routing System to Cisco CRS-3 Carrier Routing System Migration Guide
OL-13669-03
Chapter 1 Migrating to a Cisco CRS-3 Carrier Routing System
How to Migrate to a Cisco CRS-3 Carrier Routing System (8-Slot)
Hardware Requirements
• The Fabric card to be added must be prepared as described in the “Prerequisites for Upgrading to a
Cisco
CRS-3 Carrier Routing System” section on page 1-2.
Restrictions
None.
SUMMARY STEPS
1. admin
2. configure
3. hw-module power disable loc 0/SM0/SP
4. commit
5. Verify that power has been removed from the Fabric Node (state is UNPOWERED).
6. show platform
RP/0/RP0/CPU0:router#admin
RP/0/RP0/CPU0:router(admin)#config
RP/0/RP0/CPU0:router(admin-config)#hw-module power disable loc 0/SM0/SP
RP/0/RP0/CPU0:router(admin-config)#commit
RP/0/RP0/CPU0:router(admin)#show platform
Node Type PLIM State Config State
<snip>
0/SM0/SP FC/S(SP) N/A UNPOWERED PWR,NSHUT,MON
0/SM1/SP FC/S(SP) N/A IOS XR RUN PWR,NSHUT,MON
0/SM2/SP FC/S(SP) N/A IOS XR RUN PWR,NSHUT,MON
0/SM3/SP FC/S(SP) N/A IOS XR RUN PWR,NSHUT,MON
0/SM4/SP FC/S(SP) N/A IOS XR RUN PWR,NSHUT,MON
0/SM5/SP FC/S(SP) N/A IOS XR RUN PWR,NSHUT,MON
0/SM6/SP FC/S(SP) N/A IOS XR RUN PWR,NSHUT,MON
0/SM7/SP FC/S(SP) N/A IOS XR RUN PWR,NSHUT,MON
<snip>
Powering up the Replaced Fabric Card
This section describes how to enable power back to the Fabric node, and verify that node is moved to
Powered state.
Prerequisites
Software Requirements
• Cisco IOS XR Software Release 4.0.0.T or later release (Cisco IOS XR Software Release 4.0.2 for
multishelf nodes)
• ROMMON 1.54 or later version