CHAPTER 2
Site Preparation
This chapter contains the following sections:
• General Site Requirements and Recommendations, on page 5
• Required Tools, on page 6
• Prepare the Subflooring (Optional), on page 6
• Space and Clearances, on page 7
• Environment Required, on page 12
• Grounding, on page 13
• Power Source, on page 13
• Power Requirements, on page 13
• Site Preparation Checklist, on page 14
General Site Requirements and Recommendations
When planning your installation of the Cisco R42612 rack, consider the following:
• The unpacking and installation process requires three logistical steps:
• Unloading the unit from the vehicle in which it is shipped
• Using a forklift or similar device to move the unit to an unpacking site
• Moving the unpacked unit to the installation site
• Select an unpacking location with adequate surrounding space for the unloading process. You must allow
for the pallet.
• Choose an installation site that can accommodate the Cisco R42612 rack. To provide for future installation
of a joined configuration, you should plan enough space for additional cabinets that occupy the same
amount of space as the initial cabinet.
• Make sure you have enough people to help you safely unload and install the system. A fully-loaded
cabinet can weigh over 3000 lb (1360.8 kg) and moving it can present dangers to both personnel and the
incorporate equipment.
• Plan a smooth and unobstructed route from the off-loading site to the installation site. You should only
move the rack when it is empty of all equipment.
Cisco R42612 Rack and RP-Series Metered Input PDU Installation Guide
5