EasyManua.ls Logo

CITROEN C8 2002 - RFN Valve Timing: Refitting Procedures; Valve Timing Refitting Procedure

CITROEN C8 2002
133 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
41
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine : RFN
Tools.
[1] Crankshaft setting peg : (-).0189-B
[2] Camshaft hub setting pegs : (-).0189-AZ
[3] Belt retaining pin : (-).0189-K
[4] Positioning peg : (-).0189-J
[5] Tool for immobilising hub : (-).6310-T
Removing.
Disconnect the battery.
Remove:
- The under-engine shield.
- The auxiliary drive belt (see corresponding operation).
Move aside:
- The fuel delivery pipe.
- The canister purge electrovalve.
- The expansion chamber.
Remove:
- The screws (1) and (2).
- The torque reaction rod (3).
- The screws (4), plus the auxiliary drive pulley.
- The timing covers (5) and (6).
WARNING : Do not slacken the fixing screws (A).
B1EK1UDD
B1EK1T7D
B1EK0V7D

Table of Contents

Related product manuals