EasyManua.ls Logo

CITROEN C8 2002 - 3 FZ Valve Timing: Tool Positioning and Slackening; Positioning Tool [4]; Slackening Screw (10)

CITROEN C8 2002
133 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
47
CHECKING AND SETTING THE VALVE TIMING
Engine : 3FZ
Tools.
[1] Crankshaft setting peg : (-).0189-B
[2] Exhaust camshaft setting peg : (-).0189-AZ
[3] Inlet camshaft setting peg : (-).0189-L
[4] Positioning peg : (-).0189-J
[5] Tool for immobilising hub : 6310-T
[6] Belt retaining pin : (-).0189.K
[7] Engine support crossmember : 4090-T
Removing.
Disconnect the battery.
Remove:
- The under-engine shield.
- The auxiliary drive belt (see corresponding operation).
Uncouple the exhaust line (to avoid damaging the flexible pipe).
Position the tool [7].
Move aside:
- The fuel delivery pipe.
- The canister purge electrovalve.
- The expansion chamber.
B1EK0V1D
B1EK1SJD
B1EK1SLD
ENGINE

Table of Contents

Related product manuals