clime con.fi
11
Lämmittäjänkatu 4 A, 00880 Helsinki, FINLAND · Tel. +358 (0)20 198 6600
© Climecon
8. Starting the CleanMaster hood
-
tion to ensure its correct operation.
Hood connections in a Master/Slave assembly.
-
Datajamak 2x(2+1)x0.24. The ModBus data cable is connected to the
control device’s ModBus channel 2, to the points:
3: protection
1. Choose your language
2. Master/Slave
Climecon CleanMaster can be the device’s Master or
Slave device.
If the device in question is a separate hood or a group of
-
ter. Other settings do not need to be changed.
-
Master from the main controller and then the Slave
Slave devices during the initial start, and must be deter-
mined a Slave address from 1 to 9.