EasyManua.ls Logo

CLIVET WSAR-MT-E - Maintenace

CLIVET WSAR-MT-E
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
62
PERIODICAL CHECK LIST
Notes / interventions recommended to the owner
*European regulation 303/2008
Refer to the local actuation regulations; in short and just as an indication the regulation order as follow.
Companies and technicians that effect interventions of installation, maintenance/repairs, leak control and recovery must be CERTIFIED as expected by
the local regulations.
The leak control must be effected with annual renewal.
8 - MAINTENANCE
Controls effected on ……………………………..By ………………………………………………. Of the Company…………………..……………………………….
√
Frequency of intervention (months)
1 6 12
□
Presence of corrosions
□
Panel fixing
□
Fan fixing
□
Coil cleaning
□
Water filter cleaning
□
Check the exchanger efficiency
□
Circulating pumps
□
Check of the fixing and the insulation of the power lead
□
Check of the earthing cable
□
Electric panel cleaning
□
Capacity contactor status
□
terminal closing, cable insulation integrity
□
Voltage and phase unbalancing (no load and on-load)
□
Absorptions of the single electrical loads
□
Test of the compressor carter resistances
□
Leak control *
□
Survey of the refrigerant circuit operating parameters
□
Check of the 4-way change
□
Protective device test : safety valves, pressure switches, thermostats, flow switches etc
□
Control system test: setpoint, climatic compensations, capacity stepping, water / air flow-rate variations etc
□
Control device test : alarm signalling, thermometers, probes, pressure gauges etc