Non-return valve
Provide for the installation of non-return valves (A) in the case of
several units connected in parallel.
Operations sequence
Before starting the unit pump:
1 Close all vents in the high points of the units water circuit.
2 Close all drain shut-off valves in the low points of the units
water circuit
Exchangers
Pumps
collectors
storage tanks
 Thoroughly wash the system with clean water:
use the bypass to exclude the exchanger from the flow
(diagram on previous page) fill and drain the system several
times.
 Apply additives to prevent corrosion, fouling, formation of mud
and algae.
 Fill the system
do not use the unit pump
 Conduct a leak test.
 Isolate the pipes to avoid heat dispersions and formation of
condensate.
 Leave various service points free (wells, vents, etc).
Neglecting to wash will lead to the filter having to be cleaned
many times and at worst may damage the exchangers and
compressors.