EasyManua.ls Logo

CODEL SmartCem V-CEM5100 - Default Chapter; Table of Contents

CODEL SmartCem V-CEM5100
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Technical Manual CODEL
OPS.109
Issue : B
Rev. : 1
Date : 23/10/13
Doc. i/d : 0109/6
Ref. : 090028
Contents
1. Overview of the CODEL Model V-CEM5100 Flow Monitor 1
1.1. Introduction 1
1.2. Transducer Units 2
1.3. Power Supply Unit (PSU) 2
1.4. Signal Processor Unit (SPU 2
1.5. Data Display Unit (DDU) 2
2. Measurement Principle 3
3. Specification 6
4. Installation 7
4.1. Equipment List 7
4.2. Siting the Equipment 7
4.3. Installation 7
4.3.1. Fitting of Stub-Pipes and Mounting Flanges 8
4.3.2. Air Purges 9
4.3.3. Transducer Heads 10
4.3.4. PSU & SPU 10
4.3.5. DDU 11
5. Electrical Connections 12
5.1. Installation and Connection of Cables 12
5.2. Connection Schedule 12
6. Commissioning 16
6.1. Pre-Commissioning Checks 16
6.2. Introduction 16
6.3. Power Supply Voltage 16
6.4. Turning the Power ON 16
6.5. Alignment 16
6.6. Detector Levels 17
6.6.1. Detector Levels 18
7. DDU Operation 19
7.1. Introduction 19
7.2. Operating Modes 19
7.3. Key Operation 20
7.3.1. Mode Key 20
7.3.2. Arrow Keys 20
7.3.3. Enter Key 20
7.4. Program Tree 20
7.5. Operating Modes 21
7.5.1. Measurement Mode 21
7.5.2. Calibration 22