Part 3: Installation and Starting Up Starting up
23
Starting up
Communication OK?
"
" Does the symbol appear - in the clock => If not,
check the data cable to the boiler
Set language
~ OPEN flap "ENGLISH"
Ä Select E = Change mode
/ Select language " ENGLISH "
Ä Save "USER SETTING"
Set time and weekday
"TIME-DATE "
Ä Select "TIME" + E = Change mode
/ Set the time
Ä Save "WEEKDAY" + E = Change mode
/ Set the weekday
Ä Save " TIME-DATE "
ò CLOSE cover Default display
Operating mode F 1
Start up procedure
1. Please read through this manual carefully before
starting up the equipment.
2. Install the controller and switch on the boiler.
3. Wait until the display appears in the operating unit.
4. Wait until communication to the boiler is established.
5. Set the language:
The first time the control panel cover is opened after
switching on the power supply, the language appears in
the display.
(=> It is only displayed once! The language appears again
when the unit is briefly removed from the base.)
6. Set the time and weekday.
A detailed description of how to set the time and weekday
in provided in Part 1 of the operating manual on Page11.
7. Close hinged control panel cover.
8. Set the Program switch to the required operating
mode, e.g. Automatic 1 (see Pg.4)