EasyManua.ls Logo

Corghi CompactLine EM 9250 - Page 41

Corghi CompactLine EM 9250
71 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
110 EM 9250 Operator’s manual
OPERATING PHASES
OP.1 H.12
- bring the valve to the "12 o'clock" position and press to confirm
OP.2 180
-makeamarkonthetyre180°fromthevalve
- remove the wheel from the wheel balancer
- go to the tyre changer and move the mark made in correspondence with the valve
- press the key to confirm.
OP.3 H.12
- remount the wheel on the wheel balancer
- move the valve to the 12 o'clock position
- press the key to confirm.
OP.4
- perform a spin
OP.5
- turn the wheel until it is in the position shown by the position indicators
- use chalk to make a double mark on the outer side of the tyre at the 12 o’clock
position
Note: in this phase, press the
key to display:
the first time the key is pressed, the actual unbalance values of the wheel as
currently mounted on the wheel balancer; the second time the key is pressed,
the obtained unbalance value continuing with the last phase of the optimisa-
tion procedure with the improvement percentage; when the key is pressed for
the third time, the machine prepares for the last phase of the OPT programme
- remove the wheel from the wheel balancer
- on the tyre changer, move the double mark made in correspondence with
the valve
- press the
key to confirm and end the unbalance optimisation procedure.
Notes:
- The unbalance optimisation procedure can be quit at any time by pressing the
key; the displays will show the premature exit message:

Related product manuals