EasyManua.ls Logo

CORNING Everon 6200 - EU-O Rack Installation

CORNING Everon 6200
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Corning Optical Communications
Installation Manual
|
CMA-793-AEN
|
Page 24
Rack Installation
The Expansion Unit is a 19-inch 1U equipment shelf. When installing the Access Unit in a rack, make sure the
mechanical loading of the rack is even to avoid a hazardous condition. The rack should safely support the combined
weight of all the equipment and be securely anchored. Installing the Expansion Unit in a climate-controlled room with
sufficient air circulation is recommended as the maximum ambient temperature is +50°C.
To install the Expansion Unit in the equipment rack.
1.
Attach the 19-inch mounting brackets at the front of the EU, using 4 screws M3×6 per bracket and the Phillips
screwdriver. Observe the orientation of the brackets.