Product installation
Coway co., Ltd
3-1
3. Product installation
3-1 Installation materials
3-1-1 Parts
No. Accessories Items Remark
1 Drain hose
3-2 Installation method
3-2-1 Precautions on installation
The water tank capacity of this water purification system is designed for home use.
It is prohibited to install the system for medium/large business or public use.
(If the water purification system is used beyond its capacity, water shortage and/or shortened
filter life may occur as a result.)
Install the product at least 10cm away from the wall and on a firm and level floor.
Installation water pressure
- The feed water supply pressure should be at least 20 psi (0.14 MPa) for the purification system to
work properly, providing enough purified water.
Installation distance from tap water supply
- Feed water pressure 20 psi (0.14 MPa) or higher: Install the system in a place within a range of
3M in height and 25M in distance.
Do not install the system in a place where it is subjected to direct sunlight, freezing
temperature, and/or excessive moisture.
In the case the system is newly installed or relocated, read the User’s Manual once again
before installation.
This product is for AC 220V/50Hz. Make sure to check the rated voltage before connect the
power cord to the electrical outlet. (P-07QR only )
Make sure to connect the feed water inlet hose to the cold water piping.
- In the case the feed water inlet hose is connected to warm water piping with the water temperature
of 40°C or higher, filters may be damaged.
Right after the installation, fill up the water tank and drain the water.
Repeat it at least twice before use.