With the main Mounting Plate studs pointing up, place the grinding
shaft in the center slots.
Then place the spring in the center hole of the grinding shaft.
Now place the rst assembly on the grinding shaft making sure the
through holes are properly aligned with the main Mounting Plate.
The prongs on the grinding shaft should be aligned to the retainer
slots as well.
Place the outer Polycord holder on the Polycord.
Step 4
FLEX HEAD ASSEMBLY INSTRUCTIONS
24/7 Technical Support- Toll Free 1-877-472-8200
34
Concrete Polishing Solutions- G-250XTP Operator’s Manual