EasyManua.ls Logo

CPS G-250XTP - Page 34

CPS G-250XTP
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
With the main Mounting Plate studs pointing up, place the grinding
shaft in the center slots.
Then place the spring in the center hole of the grinding shaft.
Now place the rst assembly on the grinding shaft making sure the
through holes are properly aligned with the main Mounting Plate.
The prongs on the grinding shaft should be aligned to the retainer
slots as well.
Place the outer Polycord holder on the Polycord.
Step 4
FLEX HEAD ASSEMBLY INSTRUCTIONS
24/7 Technical Support- Toll Free 1-877-472-8200
34
Concrete Polishing Solutions- G-250XTP Operators Manual