2 On the user interface, go to [9.N] Export MMI settings.
3 Select OK.
4 Remove the USB memory stick and close the user interface
panel.
10.5.10 Commissioning
Overview
The following items are listed in the submenu:
A
Commissioning
User profile
Installer settings
Information
Operation
[A] Commissioning
[A.1] Operation test run
[A.2] Actuator test run
[A.3] Air purge
[A.4] UFH screed dryout
About commissioning
See: "11Commissioning"[4215]
10.5.11 User profile
[B] User profile: See "To change the user permission level"[4124].
B
User profile
Operation
Commissioning
Installer settings
Malfunctioning
[B] User profile
10.5.12 Operation
Overview
The following items are listed in the submenu:
C
Operation
Malfunctioning
User profile
Commissioning
Room
[C] Operation
[C.2] Space heating/cooling
[C.3] Tank
To enable or disable functionalities
In the operation menu, you can separately enable or disable functionalities of the
unit.
# Code Description
[C.2] N/A Space heating/cooling:
0: Off
1: On