EasyManua.ls Logo

Daikin Altherma 3 H HT - Piping installation; 8.1 Preparing water piping

Daikin Altherma 3 H HT
284 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 | Piping installation
Installer reference guide
73
EPRA14~18D + ETVZ16S18+23E
Daikin Altherma 3 H HT F
4P644739-1A – 2022.03
8 Piping installation
INFORMATION
This unit is a heating only model. Therefore, all references to cooling in this
document are NOT applicable.
In this chapter
8.1 Preparing water piping ........................................................................................................................................................... 73
8.1.1 Water circuit requirements ................................................................................................................................... 73
8.1.2 Formula to calculate the expansion vessel pre-pressure...................................................................................... 76
8.1.3 To check the water volume and flow rate............................................................................................................. 76
8.1.4 Changing the pre-pressure of the expansion vessel ............................................................................................. 79
8.1.5 To check the water volume: Examples .................................................................................................................. 79
8.2 Connecting water piping ........................................................................................................................................................ 80
8.2.1 About connecting the water piping ....................................................................................................................... 80
8.2.2 Precautions when connecting the water piping.................................................................................................... 80
8.2.3 To connect the water piping.................................................................................................................................. 80
8.2.4 To connect the recirculation piping....................................................................................................................... 83
8.2.5 To fill the water circuit ........................................................................................................................................... 84
8.2.6 To protect the water circuit against freezing ........................................................................................................ 84
8.2.7 To fill the domestic hot water tank........................................................................................................................ 87
8.2.8 To insulate the water piping .................................................................................................................................. 88
8.1 Preparing water piping
8.1.1 Water circuit requirements
INFORMATION
Also read the precautions and requirements in the "2 General safety
precautions"[410].
NOTICE
In case of plastic pipes, make sure they are fully oxygen diffusion tight according to
DIN4726. The diffusion of oxygen into the piping can lead to excessive corrosion.
Connecting piping Legislation. Make all piping connections in accordance with
the applicable legislation and the instructions in the "Installation" chapter,
respecting the water inlet and outlet.
Connecting piping Force. Do NOT use excessive force when connecting the
piping. Deformation of the piping can cause malfunctioning of the unit.
Connecting piping – Tools. Only use appropriate tooling to handle brass, which is
a soft material. If NOT, pipes will get damaged.

Table of Contents

Other manuals for Daikin Altherma 3 H HT

Related product manuals