EasyManua.ls Logo

Daikin Altherma 3 H HT - Preferential Kwh Rate Power Supply

Daikin Altherma 3 H HT
284 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 | Application guidelines
Installer reference guide
46
EPRA14~18D + ETVZ16S18+23E
Daikin Altherma 3 H HT F
4P644739-1A – 2022.03
Example
Single-phase power meter Three-phase power meter
b
5
8
0
1
5
0
0
0
c c
fed
A B
a
X5M/5+6
A Outdoor unit
B Indoor unit
a Electrical cabinet (L
1
/N)
b Power meter (L
1
/N)
c Fuse (L
1
/N)
d Outdoor unit (L
1
/N)
e Indoor unit (L
1
/N)
f Backup heater (L
1
/N)
b
5
8
0
1
5
0
0
0
c c
fed
A B
a
X5M/5+6
450896.005
A Outdoor unit
B Indoor unit
a Electrical cabinet (L
1
/L
2
/L
3
/N)
b Power meter (L
1
/L
2
/L
3
/N)
c Fuse (L
1
/L
2
/L
3
/N)
d Outdoor unit (L
1
/L
2
/L
3
/N)
e Indoor unit (L
1
/N)
f Backup heater (L
1
/L
2
/L
3
/N)
Exception
You can use a second power meter if:
- The power range of one meter is insufficient.
- The electrical meter cannot easily be installed in the electrical cabinet.
- 230V and 400V three-phase grids are combined (very uncommon), because of
technical limitations of power meters.
Connection and setup:
- Connect the second power meter to X5M/3 and X5M/4. See "9.3.4To connect
the electricity meters"[4109].
- In the software the power consumption data of both meters is added so you do
NOT have to set which meter covers which power consumption. You only need
to set the number of pulses of each power meter.
See "6.5.4Preferential kWh rate power supply"[446] for an example with two
power meters.
6.5.4 Preferential kWh rate power supply
General rule
Power meter1: Measures the outdoor unit.
Power meter2: Measures the rest (i.e. indoor unit and backup heater).
Setup
Connect power meter1 to X5M/5 and X5M/6.
Connect power meter2 to X5M/3 and X5M/4.
See "9.3.4To connect the electricity meters"[4109].

Table of Contents

Other manuals for Daikin Altherma 3 H HT

Related product manuals