9 | Electrical installation
Installer reference guide
126
EPRA08~12EAV3+W1 + ETBH/X12EF6V+9W
Daikin Altherma 3 H MT W
4P634885-1 – 2021.03
B
C
A
A
X5M.4
X5M.3
S4S
X5M.10
X5M.9
S10S
X5M.6
X5M.5
S11S
2
1
CB
X5M
X5M
34569
101314
2 Fix the cables with cable ties to the cable tie mountings.
In case of high voltage Smart Grid contacts
Wires (Smart Grid pulse meter): 0.5mm²
Wires (high voltage Smart Grid contacts): 1mm²
[9.8.4]=3 (Benefit kWh power supply = Smart grid)
[9.8.5] Smart grid operation mode
[9.8.6] Allow electrical heaters
[9.8.7] Enable room buffering
[9.8.8] Limit setting kW
The wiring of the Smart Grid in case of high voltage contacts is as follows:
S4S
34
X5MX5M
1314
K2AK1A
56910
K1ALNL
N
STEP 3
a b c d e f
STEP 1 STEP 2
A1
A2
4321X10M
K2A
A1
A2
2 1
STEP 1 Smart Grid relay kit installation
STEP 2 Low voltage connections
STEP 3 High voltage connections
1
High voltage Smart Grid contact 1
2
High voltage Smart Grid contact 2
a, b Coil sides of relays

Table of Contents