5
This product is designed and manufactured to permit
regulations.
greater than or equal to the design heating and cooling
of America.
American National Standards Institute
installed in violation of any local codes. The mechanical
installation of the packaged roof top units consists of
services; supply and return duct connections; and drain
connections (if required). The internal systems of the
unit are completely factory-installed and tested prior to
shipment.
Units are generally installed on a steel roof mounting
installation on the roof structure prior to the arrival of the
refrigeration tonnage, heating output and voltage.
Carefully inspect the unit for damage including damage
In the event of damage, the receiver should:
1.
damage to shipment or container.
2. Notify the carrier promptly and request an inspection.
3.
4.
documents:
a.
thereof.
c.
reductions.
d.
carrier representative at the time damage is
for making prompt inspection of damage and
for a thorough investigation of each claim.
claims from dealers for transportation damage.
Carefully read all instructions for the installation prior
to installing unit. Ensure each step or procedure is
understood and any special considerations are taken into
Under no circumstances shall potential sources of ignition
leaks. A halide torch (or any other detector using a naked
free area.) Ensure that the detector is not a potential
refrigerant employed, and the appropriate