EasyManua.ls Logo

Daikin DHG - Pre-Start-Up; Startup Checklist

Daikin DHG
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
99
Start-up Checklist
*Store in job le
Date: ________________________________
 ________________________________
 ________________________________
Technician: ________________________________
Location: _______________________________________
_______________________________________
_______________________________________
Unit #: _______________________________________
Pre Start-Up
(Check each item as completed)



Verify condensate connection is installed per installation instructions.
Verify proper clearance around the unit for safety, service, maintenance and proper unit operation.


Check gas piping for leaks.



Repair if necessary.

Check all electrical connections and terminals. Tighten as needed.

Verify the scroll compressor(s) are rotating in the right direction.
Verify all accessories are installed and operating correctly.

Verify the installation of the thermostat.
9/2014

Related product manuals