8
CLEARANCES
24" MIN.
24" MIN.
*In situations that have multiple units, a 36” minimum
clearance is required between the condenser coils.
safety, service, maintenance, and proper unit operation. A
access and to insure proper ventilation and condenser
unit fresh air intake.
Model size Kit part number
3 ton HEFLUE036RH
4 & 5 ton HEFLUE048060RH
6 ton HEFLUE072RH
ROOF CURB POST-INSTALLATION
CHECKS
connection frame. If gasket is loose, re-apply using strong
CAUTION
ROOF TOP DUCT CONNECTIONS
unit on rooftop.
Refer to IOD-7082 included in the literature pack for
installing horizontal duct covers.
local codes.
5
6-3/16
7-3/8
SUPPL
12" X 17"
RETURN
11" X 25"