EasyManua.ls Logo

Daikin ERGA06EAV3 - Piping installation; Preparing refrigerant piping

Daikin ERGA06EAV3
268 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 | Piping installation
Installer reference guide
75
ERGA04~08EAV3(A) + EHVH04+08SU18+23EA6V
Daikin Altherma 3 R F
4P629090-1 – 2020.08
8 Piping installation
In this chapter
8.1 Preparing refrigerant piping................................................................................................................................................... 75
8.1.1 Refrigerant piping requirements ........................................................................................................................... 75
8.1.2 Refrigerant piping insulation.................................................................................................................................. 76
8.2 Preparing water piping ........................................................................................................................................................... 76
8.2.1 Water circuit requirements ................................................................................................................................... 76
8.2.2 Formula to calculate the expansion vessel pre-pressure...................................................................................... 80
8.2.3 To check the water volume and flow rate............................................................................................................. 80
8.2.4 Changing the pre-pressure of the expansion vessel ............................................................................................. 82
8.2.5 To check the water volume: Examples .................................................................................................................. 83
8.3 Connecting the refrigerant piping.......................................................................................................................................... 84
8.3.1 About connecting the refrigerant piping............................................................................................................... 84
8.3.2 Precautions when connecting the refrigerant piping............................................................................................ 84
8.3.3 Guidelines when connecting the refrigerant piping.............................................................................................. 85
8.3.4 Pipe bending guidelines ......................................................................................................................................... 86
8.3.5 To flare the pipe end.............................................................................................................................................. 86
8.3.6 To braze the pipe end ............................................................................................................................................ 87
8.3.7 Using the stop valve and service port.................................................................................................................... 87
8.3.8 To connect the refrigerant piping to the outdoor unit ......................................................................................... 89
8.3.9 To connect the refrigerant piping to the indoor unit............................................................................................ 89
8.4 Checking the refrigerant piping.............................................................................................................................................. 90
8.4.1 About checking the refrigerant piping................................................................................................................... 90
8.4.2 Precautions when checking the refrigerant piping ............................................................................................... 90
8.4.3 To check for leaks................................................................................................................................................... 91
8.4.4 To perform vacuum drying .................................................................................................................................... 91
8.4.5 To insulate the refrigerant piping .......................................................................................................................... 92
8.5 Charging refrigerant ............................................................................................................................................................... 93
8.5.1 About charging refrigerant .................................................................................................................................... 93
8.5.2 Precautions when charging refrigerant ................................................................................................................. 94
8.5.3 To determine the additional refrigerant amount.................................................................................................. 94
8.5.4 To determine the complete recharge amount...................................................................................................... 94
8.5.5 To charge additional refrigerant............................................................................................................................ 94
8.5.6 To fix the fluorinated greenhouse gases label....................................................................................................... 95
8.6 Connecting water piping ........................................................................................................................................................ 95
8.6.1 About connecting the water piping ....................................................................................................................... 95
8.6.2 Precautions when connecting the water piping.................................................................................................... 96
8.6.3 To connect the water piping.................................................................................................................................. 96
8.6.4 To connect the water piping for domestic hot water ........................................................................................... 98
8.6.5 To connect the recirculation piping....................................................................................................................... 101
8.6.6 To fill the water circuit ........................................................................................................................................... 101
8.6.7 To fill the domestic hot water tank........................................................................................................................ 101
8.6.8 To insulate the water piping .................................................................................................................................. 102
8.1 Preparing refrigerant piping
8.1.1 Refrigerant piping requirements
INFORMATION
Also read the precautions and requirements in the "2 General safety
precautions"[49].
Piping material: Phosphoric acid deoxidised seamless copper.
Piping diameter:
Liquid piping Ø6.4mm (1/4")
Gas piping Ø15.9mm (5/8")
Piping temper grade and thickness:

Table of Contents

Related product manuals