Loading...
11 | Configuration
Installer reference guide
180
EWAA011~016DA + EWYA009~016DA
Packaged air-cooled water chillers
and packaged air to water heat pumps
4P620242-1 – 2020.06
3 Select OK.
4 Remove the USB memory stick.
11.6.9 Commissioning
Overview
The following items are listed in the submenu:
A
Commissioning
User profile
Installer settings
Information
Operation
[A] Commissioning
[A.1] Operation test run
[A.2] Actuator test run
[A.3] Air purge
[A.4] UFH screed dryout
About commissioning
See: "12Commissioning"[4185]
11.6.10 Operation
Overview
The following items are listed in the submenu:
C
Operation
Malfunctioning
User profile
Commissioning
Room
[C] Operation
[C.1] Room
[C.2] Space heating/cooling
To enable or disable functionalities
In the operation menu, you can separately enable or disable functionalities of the
unit.
# Code Description
[C.1] N/A Room:
0: Off
1: On
[C.2] N/A Space heating/cooling:
0: Off
1: On
11.6.11 WLAN
INFORMATION
Restriction: WLAN settings are only visible when a WLAN cartridge is inserted in the
user interface.
Overview
The following items are listed in the submenu: