EasyManua.ls Logo

Daikin EWAA011DAV3P - Default Chapter; Table of Contents

Daikin EWAA011DAV3P
240 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table of contents
Installer reference guide
2
EWAA011~016DA + EWYA009~016DA
Packaged air-cooled water chillers
and packaged air to water heat pumps
4P620242-1 – 2020.06
Table of contents
1 About the documentation 5
1.1 About this document ...................................................................................................................................................... 5
1.2 Meaning of warnings and symbols................................................................................................................................. 6
1.3 Installer reference guide at a glance .............................................................................................................................. 7
2 General safety precautions 9
2.1 For the installer............................................................................................................................................................... 9
2.1.1 General ........................................................................................................................................................... 9
2.1.2 Installation site ............................................................................................................................................... 10
2.1.3 Refrigerant — in case of R410A or R32.......................................................................................................... 10
2.1.4 Water .............................................................................................................................................................. 12
2.1.5 Electrical ......................................................................................................................................................... 12
3 Specific installer safety instructions 15
4 About the box 19
4.1 Overview: About the box ................................................................................................................................................ 19
4.2 Outdoor unit ................................................................................................................................................................... 19
4.2.1 To handle the outdoor unit............................................................................................................................ 19
4.2.2 To unpack the outdoor unit ........................................................................................................................... 20
4.2.3 To remove the accessories from the outdoor unit........................................................................................ 21
5 About the units and options 23
5.1 Identification ................................................................................................................................................................... 23
5.1.1 Identification label: Outdoor unit .................................................................................................................. 23
5.2 Combining units and options.......................................................................................................................................... 24
5.2.1 Possible options for the outdoor unit............................................................................................................ 24
6 Application guidelines 27
6.1 Overview: Application guidelines ................................................................................................................................... 27
6.2 Setting up the space heating/cooling system ................................................................................................................ 28
6.2.1 Single room..................................................................................................................................................... 29
6.2.2 Multiple rooms – OneLWT zone ................................................................................................................... 33
6.2.3 Multiple rooms – TwoLWT zones.................................................................................................................. 38
6.3 Setting up an auxiliary heat source for space heating ................................................................................................... 41
6.4 Setting up the energy metering...................................................................................................................................... 44
6.4.1 Produced heat ................................................................................................................................................ 44
6.4.2 Consumed energy........................................................................................................................................... 44
6.4.3 Power supply layouts with power meters ..................................................................................................... 45
6.5 Setting up the power consumption control ................................................................................................................... 48
6.5.1 Permanent power limitation.......................................................................................................................... 48
6.5.2 Power limitation activated by digital inputs .................................................................................................. 49
6.5.3 Power limitation process................................................................................................................................ 50
6.5.4 BBR16 power limitation.................................................................................................................................. 51
6.6 Setting up an external temperature sensor ................................................................................................................... 51
7 Unit installation 53
7.1 Preparing the installation site......................................................................................................................................... 53
7.1.1 Installation site requirements of the outdoor unit........................................................................................ 53
7.1.2 Additional installation site requirements of the outdoor unit in cold climates............................................ 55
7.2 Mounting the outdoor unit............................................................................................................................................. 56
7.2.1 About mounting the outdoor unit ................................................................................................................. 56
7.2.2 Precautions when mounting the outdoor unit.............................................................................................. 56
7.2.3 To provide the installation structure ............................................................................................................. 57
7.2.4 To install the outdoor unit ............................................................................................................................. 57
7.2.5 To provide drainage........................................................................................................................................ 58
7.2.6 To install the discharge grille.......................................................................................................................... 60
7.3 Opening and closing the unit.......................................................................................................................................... 60
7.3.1 About opening the units................................................................................................................................. 60
7.3.2 To open the outdoor unit............................................................................................................................... 61
7.3.3 To close the outdoor unit............................................................................................................................... 61
8 Piping installation 62
8.1 Preparing water piping ................................................................................................................................................... 62
8.1.1 Water circuit requirements............................................................................................................................ 62
8.1.2 Formula to calculate the expansion vessel pre-pressure .............................................................................. 64
8.1.3 To check the water volume and flow rate ..................................................................................................... 64

Table of Contents

Other manuals for Daikin EWAA011DAV3P

Related product manuals