EasyManua.ls Logo

Daikin FTXP35M5V1B9 - Before Operation; Initial Setup Steps; Battery Installation; User Interface Mounting

Daikin FTXP35M5V1B9
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 | Before operation
User Reference Guide
15
FTXP20~35M5V1B9
Daikin room air conditioners
4D520466-7C – 2020.03
4 Before operation
4.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
▪ Inserting the batteries in the user interface.
▪ Fixing the user interface to the wall.
▪ Turning on the power supply.
4.2 To insert the batteries
The batteries will last for about 1 year.
1 Remove the back cover.
2 Insert both batteries at once.
3 Put the cover back.
2
3
1
AAA.LR03
2
3
1
AAA.LR03
4.3 To fix the user interface to the wall
a User interface
b Screws (field supply)
c User interface holder

Table of Contents