EasyManua.ls Logo

Daikin Super multi NX E Series

Daikin Super multi NX E Series
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Trial Operation SiBE121135_A
249 Trial Operation and Field Settings
BRC1E52A7,
BRC1E52B7
Step Action Remote controller
Before test operation
1
Turn on the power supply more than 6 hours
before test operation.
2
Open the gas stop valve.
3
Open the liquid stop valve.
How to activate test operation
4
Press and hold the [Cancel] button ( ) for
4 seconds to enter the Field setting menu.
5
Use the buttons to select Test
operation ON/OFF and push the [Menu/
Enter] button ( ).
6
Test operation is displayed on the bottom of
the basic screen.
7
Push the [ON/OFF] button ( ) within 10
seconds to start the test operation.
How to check airflow direction
8
Push the [Menu/Enter] button ( ) to enter
the Main Menu.
9
Use the buttons to select Airflow
direction and push the [Menu/Enter] button
( ).
10
Check that the airflow direction is actuated
according to the setting and push the [Menu/
Enter] button ( ).
How to deactivate test operation
11
Press and hold the [Cancel] button ( ) for
4 seconds to enter the Field setting menu.
12
Use the buttons to select Test
operation ON/OFF in the menu and push the
[Menu/Enter] button ( ).
(R12872)
(R12873)
(R12874)
(R12875)
(R12876)

Table of Contents

Related product manuals