Installation ED34-862
400 FXUQ-MA
CAUTION
•
Electrical wiring work should be done by a certified electrician.
•
If someone who does not have the proper qualifications performs the work, perform the following after the test run is complete.
•
CAUTION
•
•
Clamp solidly to clamp C to tension is not added to the wiring connections.
Be aware that the fan will turn during the operation.
• After confirming drainage, turn off the power and be sure to change the emergency switch back to “NORM.”.
Inter-unit wiring terminal block
Indoor PC
board
assembly
Single phase power supply
Fig. 32
Clamp C
Tab
Inter-unit
wiring
terminal
block
123
Clamp C
NORM. EMERG.
Emergency switch
•
Checking the drain
NORM. EMERG.
•
After the checking
Remove the control box lid and change the emergency switch above the PC board assembly of the indoor unit from
“NORM.” to “EMERG.”. Connect the single-phase power supply (1, 3) and ground wire to the inter-unit wiring (50Hz
220-240V) terminal block and confirm drain operation.Be sure to change the switch before turning on the power.
(Refer to Fig. 32)
Все каталоги и инструкции здесь: http://splitoff.ru/tehn-doc.html