EasyManua.ls Logo

Daikin WSC - Page 50

Daikin WSC
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IOM 1274-3 • CENTRIFUGAL WATER CHILLERS 50 www.DaikinApplied.com

Table 16: Tower Setpoint Settings
Description Default Range PW Comments
Valve Position (Bypass) 100%
Valve Control Slope Gain 1 0 to 99 T Control gain for temperature (or lift) slope
Valve Control Error Gain 20 0 to 99 T Control gain for temperature (or lift) error
Valve Control Range (Max) 100% 0 to 100% T Maximum valve position, overrides all other settings
Valve Control Range (Min) 10% 0 to 100% T Minimum valve position, overrides all other settings
Temp–Max. Start Position 90 °F 0 to 100 °F T Condenser EWT at which initial valve position is set to max start position
Maximum Start Position 100% 0 to 100% T Initial valve position when condenser EWT is at or above Temp-Max Start Position
Temp – Min. Start Position 60 °F 0 to 100 °F T Condenser EWT at which initial valve position is set to setpoint Stage Up @
Minimum Start Position 10% 0 to 100% T
Minimum position of valve when condenser EWT is at or below setpoint Stage
Down
Valve Deadband (Lift) 1.0 psi 0 to 20.0 psi T Sets control deadband, Cooling Tower Control =Lift
Valve Deadband (Temp) 1.0 °F 0 to 10.0 °F T Sets control deadband, Cooling Tower Control =Temp
Valve Target (Lift) 30 psi 1 to 100 psi T
Target for lift pressure (Cooling Tower Control = Lift), Works with Fan Stage Down
Time
Valve Target (Temp) 65 °F 40 to 120 °F T
Target for condenser EWT (Cooling Tower Control = Temp),
Works with Fan Stage Up Time
VFD Stage Down @ 20% 0 to 100% T
Valve position below which the fans can stage down
(Tower Valve/Fan VFD Strategy = Valve Stage)
VFD speed below which the fans can stage down
(Tower Valve/Fan VFD Strategy = VFD stage or valve SP/VFD stage)
VFD Stage Up @ 80% 0 to 100% T
Valve position above which the fans can stage up
(Tower Valve/Fan VFD Strategy = Valve Stage)
VFD speed above which the fans can stage up
(Tower Valve/Fan VFD Strategy = VFD or valve SP/VFD stage)
Cooling Tower Control None None, Temperature, Lift T
None: No tower control
Temperature: Fan and valve controlled by condenser EWT
Lift: Controlled by lift pressure
Tower Valve/Fan VFD
Strategy
None
None, Valve SP, Valve
Stage, VFD Stage,
Valve SP/VFD Stage
T
None: No tower valve or VFD
Valve Setpoint: Valve controls to Valve Target and Valve Deadband
Valve Stage: Valve controls between fan stages
VFD Stage: 1st fan is VFD controlled, no valve
Valve SP/VFD Stage: Both valve and VFD
Tower Valve Type NC (To Tower) NC, NO T Normally closed or normally open to tower
Cooling Tower Stages 2 1 to 4 T Number of fan stages used
Fan Stage Up Time 2 min 1 to 60 min T Time delay between stage up/down event and next stage up
Fan Stage Down Time 5 min 1 to 60 min T Time delay between stage up/down event and next stage down
 65 psi 10 to 130 psi T 
 55 psi 10 to 130 psi T 
 45 psi 10 to 130 psi T 
 35 psi 10 to 130 psi T 
󰀨 6.0 psi 1.0 to 20.0 psi T Fan staging deadband with Cooling Tower Control=Lift
 85 °F 40 to 120 °F T 
 80 °F 40 to 120 °F T 
 75 °F 40 to 120 °F T 
 70 °F 40 to 120 °F T 
󰀨 3.0 °F 1.0 to 10.0 °F T Fan staging deadband with Cooling Tower Control=Temp

Other manuals for Daikin WSC

Related product manuals