Technical Information  KPP PPU
11029257 • Rev BB • July 201318
The following steps require a 1/2 inch open end wrench with standard 22° oset and a Volt Ohm 
Meter (VOM):
1.  Installation 
 
First ensure that KPP is installed correctly. There are distinct directional and installation 
procedures, (reference Procedures for Flat End and Conical End Models, page 14 to 15).
2.  Speed Signal 
 
Check for speed output using a VOM. Place VOM across the ground and speed pins or 
terminals, (reference Dimensions, page 7) and set VOM to the DC Volt scale and low range. To 
check for an output, turn pump or motor very slowly by hand or check output just as the prime 
mover is coming to a stop. Note a voltage pulse at meter. It will likely be dicult to read exactly, 
simply note a pulse (approximately. 60 pulses per rev.). If there is no indication of a pulse, 
replace KPP.
3.  Directional Signal 
 
Check for a direction signal change using a VOM. Use the same VOM setup as in the above 
speed signal check. Turn the motor slowly and note a polarity change (±) on the VOM display as 
you change the motor direction.
Troubleshooting Steps
Connector Pin Assignments
C
Ground
3 pin Deutsch Plug DT Series connector
3523
A
Power +
B
3 or 4 pin Delphi Connector
Power +
Speed
Ground
Direction
A
B
C
D
4 pin Deutsch® Plug DT Series Connector
1
wer +
3
Ground
2
Speed
4
Direction
3526
4 pin Turck Eurofast connector
Keyway ref
A
Power +
D
Ground
12.7 [0.50]
Flats
C
Speed
B
tion