© Danfoss A/S (RA Marketing/MWA), Nov. 08  RS8FE102, 080R9278    15
OPTYMA
TM
 Control three-phase  Operation and Maintenance Guide
1.
Close the front panel, making sure that all the wires 
are inside the  housing  and that  the housing  seal is 
located securely in its seat
Closing the control
2.
Tighten the front panel using the 4 screws, making 
sure  the  rubber  washers  are  used  on  the  head  of 
each screw.
Replace the screw cover on the right-hand side.
 
3.
Power up the control and carry out thorough reading/
programming of all the parameters.
Below  is  a  step  by  step  description  on  how  to 
calibrate the motor circuit breaker dedicated to the 
compressor.