DATAKOM DKG-705 User’s Manual
705_USER.doc - 37 -
Program Group 4
Group
Description
4 400, 402,
404,406,
408, 410,
412, 414
Turn_on - - Weekly schedule turn_on times. The day and
time information is defined in 15 minute steps.
4 401, 403,
405,407,
409, 411,
413, 415
Turn-off - - Weekly schedule turn-off times. The day and
time information is defined in 15 minute steps.
4 416-431
Telephone number #1 - - Each program parameter changes one digit of
the first telephone number. The parameter 416
points to the first digit of the number, the
parameter 417 points to the second digit etc…
Non-numeric characters will be skipped.
4 432-447
Telephone number #2 - - Each program parameter changes one digit of
the second telephone number. The parameter
432 points to the first digit of the number, the
parameter 433 points to the second digit etc…
Non-numeric characters will be skipped.
Program Group 5
Group
Description
5 500
Wait before Fuel Min.
0 240 This is the time between the mains fails
and the fuel solenoid turns on for starting
the genset.
5 501
Wait before Start Sec
0 30 This is the time after the fuel solenoid is
energized and before the genset is
started. This will be the preheat period if
glow plugs are used.
5 502
Wait between Starts Sec
1 30 This is the waiting period between two
start attempts.
5 503
Start Timer Sec
1 15
This is the maximum start period. Starting
will be automatically cancelled if the
genset fires before the timer.
5 504
Start Attempts - 1 6 This is the maximum number of start
attempts.
5 505
Stop Timer Sec
0 90 This is the maximum time duration for
the engine to stop. For Activate to Stop
type engines this will be the period
during which the stop solenoid is
energized. If the genset has not stopped
after this period, a FAIL TO STOP alarm
will occur.
5 506
Mains Waiting Timer Min.
This is the time between the mains
voltages and frequency entered within the
limits and the generator contactor is
deactivated.
5 507
Cooling Timer Min.
This is the period that the generator runs
for cooling purpose after the load is
transferred to mains.
5 508
Mains Contactor Timer Sec
This is the period after the generator
contactor has been deactivated and
before the mains contactor has been
activated.